Ms Kataria Construction was established and incorporated in March 2001 by Mr. Mansukh Kataria (Proprietor) for Oil and Natural Gas Pipeline Projects. Gradually with his hard work, foresight and dedicated teamwork, in few years the company grew up with its owned equipment and achieved milestones with its esteemed clients of Oil and Natural Gas including Petrochemicals like Gujarat Gas Limited, Reliance Industries Limited, L&T Hydrocarbon Engineering Limited, SRF Limited, Linde India Limited, Deepak Phenolics Limited etc.
Presently we are having our owned 2 Sets of HDD Machine of 35 Ton and 96 Ton Capacity with Rock Tools and others. Looking at the CGD Projects as well as cross country Pipeline Projects, where CNG/PNG Projects will have demand of experienced Construction Company with technically skilled human resources and equipment who can cater all services of the industry under one roof. With the ambition of the same we are working to cater one stop solution for all disciplines of Pipeline as well as Facility Piping Projects from inception to commissioning like:
Project Planning Package
- Detailed/Residual Engineering
- Civil and Structural Works
- Pipeline and Facility Piping Works
- Horizontal Directional Drilling Works
- Electrical & Instrumentation Works
- Packaged Equipment Erection and Alignment
- Hydrotesting and Air-drying
For successful completion of EPC Projects, we are having our own experienced Personnel / Equipment and also tied-up with our associates for:
- Detailed Design Engineering
- Equipment Supply
- Material Supply (Approved Vendors)
- Specialized Services Like Hot Tapping, Stoppling works, EGP/Caliper and Intelligent Pigging
LIST OF OWNED EQUIPMENTS
Horizontal Directional Drilling
Machines
|
XCMG Series XZ450-96 Ton and XCMG
Series XZ320E-34.5 Ton Pull Back Capacity
|
Excavator Tyre Mounted JCB make
|
02
|
Excavator Chain Mounted L&T
Komatsu Pc200
|
03
|
Drying Unit 1200 CFM
|
01
|
Hydra Crane 14 Ton Capacity
|
02
|
Ador Super Challenger Welding Machine
(401)
|
02
|
Ador Welding Rectifier
|
20
|
Diesel Generator 45 KVA
|
05
|
Air Compressor 350 CFM
|
02
|
Air Compressor 600 CFM
|
02
|
Truck (Multi Axle 24 Ton Capacity)
Mahindra Make
|
02
|
Tractor with Trolley
|
08
|
Theodolite/Total Station
|
02
|
Pressurizing Pump/Water Filling Pump
|
10
|
Dead Weight Tester
|
02
|
Ultra Sonic Testing Machine
|
02
|
De-watering Pump/Mud Pump
|
05
|
Sand Blasting Unit
|
04
|
Holiday Detector 0-25 KVA
|
08
|
Rock Breaker for PC-200 and JCB
|
03
|
SUV/Pickup
|
05
|
PROJECT TEAM
Project Manager
|
02
|
Construction Manager
|
05
|
Project Engineer
(QC/Planning/Discipline Engineer)
|
10
|
Project Coordinator
|
03
|
Surveyor
|
02
|
Foreman
|
10
|
Accountant
|
02
|
Hr/Admin/Legal
|
05
|
Skilled/Semi-Skilled Workers
|
100
|
Technician
|
05
|